Abu Dhabi skyline link to the ADSSC site link to Home page

STEP — Strategic Tunnel Enhancement Programme

Sunday, 5 September, 2010 1:43 AM Skip Navigation Links > STEP Programme Link Sewer 01

STEP Link Sewer Contract 01

STEP Link Sewer Contract 01

Link Sewer 01: Link Sewer contract 01 is to collect wastewater on Abu Dhabi Island from the catchment and sub-catchment level and channel it to the STEP Tunnel. Link Sewer contract 01 also encompasses the removal of wastewater from Saatiyat Island to a transmission main located in the area of Al Raha Beach.

Major Programmes

to the top